At its November 4, 2020 meeting the St. Marys City Commission adopted an ordinance and two resolutions that established a Parallel Generation policy. The Policy Documents are based upon the model standards developed by the Kansas Municipal Utilities (KMU). The Parallel Generation Charge is based upon a calculation developed by the city's power supplier, the Kansas Power Pool (KPP). (Net Metering is not available.)
POLICY DOCUMENTSClicking on the link above will open a pdf that contains the technical information and documentation needed to make application for an interconnection with the City of St. Marys electrical system. The Interconnection Application begins on page 22.
|
MASTER FEE RESOLUTIONThe link above is to the city's Master Fee Resolution. Pages 2 and 3 of the pdf contain most of the relevant information.
|